Newcleo First of a Kind (FOAK) Schedule Development.

Sector: Energy
Services: Project Controls
Location: UK - UK & Europe

Project Introduction.

safe, clean, and sustainable nuclear energy

Launched in September 2021, Newcleo entered the field of nuclear energy with a focus on developing safe, clean, and sustainable nuclear energy. Their aim was to amalgamate existing technologies cost-effectively and set a new standard in nuclear energy, specifically by designing lead-cooled fast reactors (LFRs) fueled with MOX for the next generation (Generation IV).

This initiative sought to contribute to climate change mitigation, global decarbonisation, and provide a stable power source while minimising nuclear waste. Recognising the importance of securing grant funding, Newcleo urgently required a First of a Kind (FOAK) schedule.

The Problem.

Newcleo faced the challenge of creating a comprehensive FOAK schedule to support their grant funding bid. The complexity of designing and building Generation IV nuclear reactors, coupled with the need to adhere to stringent safety and sustainability standards, emphasised the requirement for a robustly developed KOAK schedule using resources that understood the intricacies of constructing Generation IV nuclear reactors.

Our Solution.

Movar solution involved refining Newcleo's WBS by identifying and defining FOAK gaps. Drawing on experience from similar projects, applied industry norms to key areas, including commercial and funding considerations, design development, validation and verification processes, GDA and safety case assessments, site selection and preparation, permits and consents, and site construction.

Movar adhering to good planning practices, ensured schedule development prioritised continuity, consistency, and industry standards using Primavera P6.

The Results.

Collaborating with Newcleo's team, Movar successfully established and detailed the FOAK schedule, incorporating the activity network for logic and durations. The critical path was extracted using backward pass methodology and rigorously assured by Newcleo. Adjustments were made where necessary to finalise a robust FOAK delivery schedule.

Following schedule development, MOVAR conducted a thorough assessment of its integrity and robustness using specialist software, ensuring accuracy and alignment with Newcleo's stringent standards in their pursuit of nuclear energy solutions.

Case Studies.

Discover Our Impact:

Explore Movar's successes and innovative solutions across the diverse sectors that we cover.

View All

Working With The Best.

collaborative project management partnerships

We’re fortunate to work with some of the leading clients and partners around, and would love for you to join the community. We've forged strong long-lasting relationships so get in touch to see how we can work together to improve your project delivery capability.